In the next few days there’s going to be a moderately significant code push coming into production. Basically here’s what is coming up:
- Extended link reporting (when submitting a link report you’ll be given a choice as to what type of report to help us better manage link reports)
- System notifications (The system will be sending out notices to users for significant actions that occur with their links, like when their link is approved, if a link report is confirmed and needs your attention). That kind of thing
- Administrator category filing. We know that sometimes you file your link in a category that doesn’t exactly meet up with what we had intended. Well, instead of just flatly refusing to approve your link, there is now a special administrator capability to re-file your link for you.
- Editor link feedback messaging. If we are having a problem approving your link, or we confirmed a link report, the editor will be able to send you a message detailing what the problem is, and how you can remedy the situation.
The development for these enhancements are nearly complete and roll out should occur this week. I’ll post when it does happen, in that it will require a minor outage of the application (about 15 minutes).
In Other News: DiyShare is coming along. Its a rather large project and is taking longer, but I’m making progress on it almost every day. A huge chunk of the Java code is complete.
Home > About This Post
This entry was posted by blinder on Tuesday, August 8th, 2006, at 1:37 pm, and was filed in site news.
Subscribe to the
RSS 2.0 feed for all comments to this post.
Post a Comment
You must be logged in to post a comment.